During the 1st opening slowdown, R6 has _______ resistance for bypassing current around the motor armature.

Study for the NEIEP Elevator Cab Assembly and Door Operators (530) Test. Practice with flashcards and multiple choice questions, each question has hints and explanations. Ensure you are ready for the exam!

In the context of elevator door operators, the first opening slowdown is a critical phase in the operation of the door mechanism. During this phase, the motor control circuit is designed to ensure a smooth and controlled deceleration of the door as it approaches a fully opened position.

When discussing R6's resistance during this phase, it is essential to understand its role in the circuit. R6, being a part of the feedback loop in the control system, serves to limit the current that bypasses the motor armature. By having maximum resistance, R6 effectively reduces the amount of bypass current flowing around the motor, which is crucial for preventing abrupt actions that could lead to a sudden stop or jerk of the door. This maximum resistance ensures that the door decelerates gradually, promoting a smoother operation which is key for user safety and comfort.

In essence, having maximum resistance at R6 during the first opening slowdown is vital for controlling the current and ensuring that the motor can smoothly transition from a high-speed to a lower-speed operation as the door opens. This mechanism helps protect both the mechanical parts of the elevator system and the passengers.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy